English (en) | Change Language


Figure 10. Notice the running bond and vertical seams as well as tie wires sticking out between courses. The hanging brick held barbed wire into place until displaced by an earthbag; string aids in keeping the bricks near the working level of construction instead of having to place and pickup bricks. Source: Cody Kiefer


Download